Funding & advisory
For solar, wind, bioenergy and EV charging projects: the approval route, a project report for lenders, and the schemes that may apply.
Free consultation
Project types
Solar, wind, bio, EV
Project report
Usually 2‑3 weeks
Schemes checked
PM Surya Ghar, PM‑KUSUM
Plant design by
Your EPC or engineer
Route and approvals note
The regulatory route for your project and each approval it needs, in order.
Project report
Capital cost, financing, savings or revenue and payback, for lenders and investors.
Scheme check
The central and state support that applies to your project, with its conditions.
Project type and size, the site, who will use or buy the power, and your timeline.
The regulatory route and the approvals it needs, with the authority and the usual sequence.
Central and state support that applies to your project type.
Cost, financing, generation figures from your EPC or engineer, savings and payback.
Entity and tax registrations, and the applications on your list.
Times are typical and depend on the scope of the work.
Tick what you already have. We help you get the rest.
0 of 6 ready
Renewable Energy Consultation
PM Surya Ghar gives central support only for residential rooftops, including housing societies for their common areas. PM-KUSUM has covered solar pumps and solar plants on farmland; its first phase is closing out and a second was under consideration in 2026, so we check what is open. Commercial and industrial rooftops usually rely on state policy benefits and bill savings rather than a central subsidy.
Under the Green Energy Open Access Rules, 2022, consumers with a contract demand or sanctioned load of 100 kW or more can buy renewable power through open access, subject to their state commission's regulations and charges.
No separate electricity licence is needed to set up a public charging station. You still need a power connection from the DISCOM and the usual local permissions, and must follow the Ministry of Power's charging guidelines.
No. System design, generation estimates and installation are for your EPC contractor or engineer. We handle the business side: approvals, finance, the project report, schemes and registrations.
The DISCOM fits a two-way meter, and the power you export is set off against the power you draw. The size limit and how any surplus is paid are set by your state commission's regulations, so we check them for your DISCOM before you size the plant.
Didn't find your question?
Ask us on WhatsApp and we'll answer it.
Tell us a little about your business. Someone from our team calls you back, usually the same working day.
First step:Scoping callDay 1